Public High School | Castel Nuovo Di Porto, Rome, Italy, Europe

The guidelines of the design is to convert an existing public school located in Rome into nearly Zero-Energy Buildings.

The project team has analyzed the school building in an integrated approach: Considering structural, functional and energy – related aspects in a joint view.

The integration of the design solutions allowed to obtain an high energy performance school – ‘Nearly Zero Energy’ building. Seismic structural assessment and reinforcement design was performed

Date: ongoing project

Estimated project cost: 547.764,00 €. (EUR)

Services:

  • Architectural design
  • Structural design
  • Mep design
  • Thermal insulation
  • Acoustic
  • MEP system desing
  • Site construction management